Hanna-instruments BL 7916 Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Urządzenia pomiarowe Hanna-instruments BL 7916. Hanna Instruments BL 7916 User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - BL 7916 • BL 7917

Instruction ManualBL 7916 • BL 7917pH and ORPMeasuring & DosingSystemwww.hannainst.com

Strona 2 - WARRANTY

1918TERMINAL CONNECTIONS BL 7917Pt100 (for BL 7916 only)A 2-wire Pt100 can be connected to provide automatic temperaturecompensation of the pH measure

Strona 3 - GENERAL DESCRIPTION

2120SETPOINT ADJUSTMENTS• Move the display selector switch to SET.• With a small screwdriver adjust the SET COARSE trimmer todisplay a value close to

Strona 4

2322TROUBLESHOOTING GUIDEELECTRICALThe pump does not operate when turned ON:• Check the power supply and connections. Voltage should bebetween 100 - 1

Strona 5 - SPECIFICATIONS

2524SCHEDULED MAINTENANCEAfter 50 hoursTight the pump head screws with a torque force of 2.5 Nm (22"lbf).After 12 monthsIt is recommended to repl

Strona 6 - MECHANICAL DIMENSIONS

2726These bubbles can be removed by "shaking down" the electrode asyou would do with a glass thermometer.If the bulb and/or junction are dry

Strona 7

2928• Slow Response/Excessive Drift: Soak the tip in Hanna Solu-tion HI 7061 for 30 minutes, rinse thoroughly in distilled waterand then follow the Cl

Strona 8

3130Reducing pretreatment: immerse the electrode in HI 7091 solution fora few minutes.Oxidizing pretreatment: immerse the electrode in HI 7092 solutio

Strona 9 - START-UP

3332Hydrogen Sulfide AqueousSolutionHypochlorous AcidKeroseneLactic AcidLard OilLauric AcidLead AcetateLinoleic AcidLinseed OilLithium SaltsMagnesium

Strona 10 - LEVEL CONTROL

3534HI 721101 Pump head, O-Ring, 6 screws and washersHI 721106 Pump head, Large PTFE Diaphragm, AluminumPiston and Aluminum DiskpH CALIBRATION SOLUTIO

Strona 11

3736HI 3130B/3 BNC connector, 3 m (9.9') cable, Pt, glass-body withexternal threadHI 3110T Screw connector, external PG13.5 thread, doublejuncti

Strona 12 - OPERATING

32PRELIMINARY EXAMINATIONRemove the pump from the packing material and examine it carefullyto make sure that no damage has occurred during shipping. I

Strona 13 - CLEANING THE PUMP HEAD

CE DECLARATION OF CONFORMITYHanna Instruments reserves the right to modify the design,construction and appearance of its products without advancenotic

Strona 14 - ELECTRODE CONDITIONING

MAN7916R307/05SALES AND TECHNICAL SERVICE CONTACTSAustralia:Tel. (03) 9769.0666 • Fax (03) 9769.0699China:Tel. (10) 88570068 • Fax (10) 88570060Egypt:

Strona 15 - TROUBLESHOOTING

54FLOW RATE CHARTThe following chart shows the inverse relationship between flow rateand pressure.The table below shows typical reduction of the flow

Strona 16 - TAKING REDOX MEASUREMENTS

76FUNCTIONAL DESCRIPTION BL 7917Unplug the instrument from the power supply beforereplacing the fuse or making any electrical connections.1. Discharge

Strona 17 - WITH BLACKSTONE PUMPS

98VALVE / HOSE ASSEMBLY DIAGRAMNECKRange -999 to +999 mVResolution 1 mVAccuracy (@20°C/68°F) ±5 mVTypical EMC Deviation ±6 mVInput Impedance 10¹² OhmD

Strona 18 - ACCESSORIES

1110INSTALLATIONMaterials Needed• LDPE hose (7 meter/22 feet) (included) or other type of tubing(PTFE, for example) more suitable for a specific appli

Strona 19 - PLATINUM ORP ELECTRODES

1312Probe connectionsConnect the pH/ORP electrode to the BNC socket of the pump.The foot valve assembly (HI 721005)should always hang vertically and n

Strona 20 - CE DECLARATION OF CONFORMITY

1514• Repeat the same installation procedure for the hose connectionson the discharge end with the injection assembly (HI 721004)• Secure the hose so

Strona 21 - MAN7916R3

1716Downhill InstallationSuggested installation when pumping from one container to another,each at different levels and with only nominal pressure.STA

Powiązane modele: BL 7917

Komentarze do niniejszej Instrukcji

Brak uwag